Flatwork

We haven’t been out to the new house for a while because not much has been happening. When we went out today, all the concrete flatwork in the basement and garage had been done.

flatwork1.png
The cold storage room – this will be underneath the front porch

flatwork2.png
Anne and Caroline in the garage

flatwork3.png
Nancy was worried about a crack in the basement floor. I’m not too concerned about it.

flatwork4.png
What I think is the phone line (black cable) has been run up to the demarcation point. I’m pretty sure the metal pipe will house the electric line

Leave a Reply